
- A 3500 foot topographic survey for an improvement of
the Athens Blacktop (FAS Route 574) in Menard County,
Illinois. Survey was performed using a combination of
GPS methods and Total Station surveys. The project
required reestablishing the existing centerline of right
way.
- Land surveys and right of way surveys to establish
existing right of way limits and parcel lines for the
preparation of existing right of way layout drawings,
proposed right of way plats and descriptions for a
bridge replacement on Illinois Route 4 in Chatham,
Illinois. The project required reestablishing 2 previous
conflicting existing right of way alignments. All data was
tied to the Illinois State Plane Coordinate System.
- Reestablish existing right of way, perform boundary
surveys tied to State Plane Coordinates and prepare
plats of survey for 9 whole-take parcels along FA 666,
9th Street in Springfield, Illinois for the Illinois
Department of Transportation, District 6.
- Reestablish existing right of way, perform boundary
surveys tied to State Plane Coordinates, and prepare
temporary construction easement plats for the
improvement off the intersection of Routes 4 and 104 in
Auburn, Illinois for the Illinois Department of
Transportation, District 6.
- Topographic and route survey with document
preparation for the Illinois Department of
Transportation, District 3 along Illinois Route 47 from
Forrest to Saunemin in Livingston Co.
- Topographic survey for lake siltation monitoring at a
wetland creation site in Brown Bounty, Illinois for the
Illinois Department of Transportation, District 6.
- GPS control surveys for Menard & Moultrie Counties.
- 60 acre boundary reconstruction survey along the
Sangamon River in Cass County, Illinois.
- Topographic survey for drainage tile design in rural
Sangamon County.
- Various cell tower surveys throughout central Illinois
for raw land and co-locate sites.
- Topographic bridge survey and digital terrain modeling
for the Illinois Department of Transportation, District 7
for Illinois Route 47 in Mattoon, Illinois.
- Topographic bridge survey and digital terrain modeling
for the Illinois Department of Transportation, District 6
on I-55 / 6th street in Springfield, Illinois.
- Construction staking for a new coal conveyor belt
system at a coal mine in central Illinois.

RECENT PROJECT HIGHLIGHTS
- Quarterly topographic surveys at a central Illinois coal
mine and surface modeling for excavated coal volume
reconciliation and documentation.
- Topographic survey for sewer system upgrades at a
wildlife park in central Illinois.
- Topographic survey for drainage tile location and
creation of new drainage district in Logan County,
Illinois.
- Topographic surveys of existing conditions at multiple
McDonald's restaurant sites in central Illinois.
- Numerous topographic and right of way surveys at
bridge rehabilitation sites throughout Illinois.
- Right of way and topographic survey with document
preparation for a 2 mile road reconstruction project in
Jackson County, Illinois.
- Construction staking for roadway improvements at a 1
mile section of County Highway 2 in Menard County,
Illinois.
- Construction staking for a 10 mile section road
resurfacing project in Logan County, Illinois.
- Right of way survey and document preparation for the
Illinois Department of Transportation, District 6 on a
section of Illinois Route 54 in Springfield, Illinois.
- Right of way survey and document preparation for road
improvements along 10 miles of County Highway 1 in
Woodford County, Illinois.
- Tract surveys for land division in Sangamon County,
Illinois following the Springfield Sangamon County
Regional Planning Commission regulations.
- Topographic survey for sewer improvements in
Monmouth, Illinois.
© MICHAEL E. RAPIER SURVEYING, INC.
Michael E. Rapier Surveying, Inc.
|